In line with Vĩnh Phúc Province‘s sustainable development and environmental protection strategy, the project to construct two centralized wastewater treatment plants, each with a capacity of 170 m³/day.night (corresponding to Zone A and Zone B), was implemented in 2024. This is a significant step toward thoroughly treating wastewater generated within the division.

Project Scale & Key Components

The project includes the following main components:

  • Design of domestic and industrial wastewater treatment technology
  • Supply & installation of treatment equipment meeting QCVN 14:2008/BTNMT standards
  • Construction of collection tank, equalization tank, biological tank, sedimentation tank, and disinfection tank
  • Installation of electrical-control systems, pumps, air blowers, sludge press, etc.

Design capacity: 170 m³/day.night per plant

Implementing Unit & Quality Commitment

The project is fully undertaken by Hydrotech Joint Stock Company, with many years of experience, responsible for:

  • Consulting on technology suitable for local wastewater characteristics
  • Supplying genuine equipment with warranty
  • Installation, commissioning, and handover on schedule
  • Supporting legal documentation, acceptance, and operational training

Environmental & Economic Benefits for the Locality

Once operational, the Bình Xuyên Wastewater Treatment Plant will:

  • Remove over 95% of pollutants from inlet wastewater
  • Protect surface water and groundwater for residential areas
  • Reduce environmental fines and increase land use value

Project Overview

CategoryInformation
LocationBình Xuyên, Vĩnh Phúc
Capacity170 m³/day.night
Treatment TechnologyBiological + coagulation – sedimentation – disinfection
Main ComponentsEquipment supply, installation, and automatic control
Completion TimeQuarter II/2024
Implementing UnitReputable specialized wastewater treatment contractor